Skip to main content

Selections

Material Select & Procure Options

Major Project Intelligence

Step 1: DSP (Design • Select • Procure) The 75% Planning Phase: This is our Project Intelligence stage. We design your custom layout, help you select every finish, and procure materials to lock in pricing.

  • The Goal: Building on Paper. We solve the math and the design before the first hammer swings.

Step 2: PBC (Permit • Bid • Construction)

  • The 25% Execution Phase: We handle the city permits, pull competitive bids from our specialized vendors based on your DSP master plan, and manage the physical construction on the ground.

Minor Remodeling & Repairs

General Services (Minor Remodeling & Repairs)

For smaller updates or maintenance where complex engineering isn't required, we use our streamlined PSI format.

  • PSI (Pick • Select • Install): A traditional, high-speed approach:
  • You Pick the project scope, Select your finishes from our curated options, and we Install with professional precision.
  • No long-term design phase required.

Material Procurement Options

We give you total control over how your finished materials are handled:

Option A: YSYSF (You Select • You Supply for Free)

  • You choose the materials and have them delivered to the site yourself. We charge $0 for procurement; you simply pay for the labor to install them.

Option B: YSWSR (You Select • We Supply with Retainer)

  • You choose the materials, and we handle the ordering, logistics, and quality checks. This is managed under a professional retainer to ensure everything arrives on time and to spec.

BRAND NAME PLUMBING, ELECTRICAL FIXTURES, TRIM AND HARDWARE

FIXTURES, TRIM AND HARDWARE(F-T-H) SUPPLIED BY OTHERS.

  • F-T-H are defined as: Electrical, Plumbing, Toilets, Shower Glass, Faucets, Valves, Vanities, Sinks, Vanity Tops, Paper Hangers, Shower or Towel Bars.
  • You Select You Supply Price includes the installation of F-T-H only. All plumbing & Electrical fixtures, hardware and amenities to be supplied 
  • Contractor shall not be responsible for F-T-H supplied by others and losses due to damage, improper shipping, Manufactured defects and packaging, etc.
  • F-T-H and amenities are not the responsibility of DFW RE TEAM + PDH BUILDERS. F-T-H must be purchased and stored.